Building The Footing Forms

I started building the forms today. They'll be 24" wide and 12" deep, and will be built using FastFoot form-bags. This means that I only have to build the top level of the form, not the sides.


The forms start off with 2x4's being attached horizontally to 1x4 stakes driven into the ground. The 2x4's are attached to the stakes with screws so that they can be removed after the concrete has been poured.



I tried and tried, but I just couldn't drive this stake through a rock.