Sunday, November 18, 2007

Foundation Waterproofing

This is turning out to be a time consuming process because I have to try to get most of the moisture out of the ICFs before I can apply the waterproofing membrane. I've been doing this with a heat gun and lots of paper towel. Rather tedious, but I've got one wall finished now.

The final grade around the house will be higher at the front than at the back, hence the reason that the membrane is higher up the wall at the front of the house.

No comments:

Post a Comment