Friday, December 7, 2007

Drainage Rock

There's 12 cubic yards in a load of drainage rock and I'm just about at the end of this load. I've got two spots where I can get the tractor fairly close to the basement excavation, so I load up the bucket and dump the rock over the edge into the hole, then I shovel it into three-gallon pails and dump it where it's needed.

I've got about 12" of rock over top of the pipes here. Another 6" to go.