Friday, January 4, 2008

Floor Joists Half Done

The floor joists are about half done now. The kitchen area is complete as well as part of the living room. Notice the different spacing between the joists on one side of the beam as compared to the other. In the kitchen, the joists are spaced every 12 inches because of their extra length. On the other side, they're spaced 16 inches apart. The end all result will be a solid floor throughout.

No comments:

Post a Comment