Wednesday, March 19, 2008

Interior Walls

I've been working on framing the interior walls today. The wall in front of the patio door opening (on the left) is a temporary wall for the upstairs floor support. More on that in the next few days.

This corner of the wall forms part of the support structure for the roof ridge beam. This column is made of eight 2x6s and sits directly above the big column that I built in the basement in December... (see this post). The three shorter 2x6s on the right are part of the column, but they will also support the end of the long header over the opening between the kitchen and the living room area.