Saturday, March 22, 2008

Productive Afternoon

I built a couple of interior walls this afternoon. I laid out the sole plates on the floor first, measured the angles, and then used a chalkline to line them up with the stub wall at the far end.



They're load-bearing walls, so there's lots of studs in them. I have to install the headers and the second top plates yet, so they're not quite finished. The large opening will be for a closet and the small opening is for the back hallway.

1 comment: