Monday, September 28, 2009

Main Ridge Vent Finished

Today I finished the main ridge vent and have the top three feet of shingles installed from end to end now.





In a post about a week ago, I talked about the details of installing the ridge vent and cap shingles, and I mentioned briefly about nailing the last cap shingle down and covering the nails with silicone.

All along the ridge vent, each shingle is nailed so that the next cap shingle covers the previous shingle's nails. That's why you can't see any nails along the top. However, when you get to the end, obviously you still have to nail the last shingle down, but because it's the last shingle, there won't be another shingle to cover those nails.

So, you cover the nail heads with a bit of brown silicone, then you sprinkle a few shingle granules on top and press them lightly into the wet silicone. (There's always a bunch of loose shingle granules inside the plastic wrap from the bundles of shingles.)

The nail heads all but disappear, and from ground level you won't be able to tell at all.

Here's with the nails showing.



Here's with a bit of silicone.



Here's with the shingle sprinkles.

Sunday, September 27, 2009

Ring-Shanked Nails

For the roof platforms I use for shingling, I usually tack everything together with hand-driven 3" common nails because it's easier to pull everything apart when I need to move the platforms. Today I was reassembling one of the platforms and I didn't have any of the 3" nails within reach, so I grabbed my framing nailer and used it.

I use ring-shanked nails in my framing nailer. The rings are like little ridges on the nail. There is also a red coating on the bottom half of the nails, which I imagine is something to increase adhesion.

Anyway, after I was done with the work platform and started tearing it apart, those nails held so well that when I went to pry the top board off, it pulled the heads of both nails right through the top board. The nails stayed stuck in the bottom board. This has actually happened to me several times, and I'm continually amazed by how well those nails can hold.

Click on the photo below to enlarge it. You can see the two nails are still stuck in the bottom board after I've pried the top board off.

Saturday, September 26, 2009

Roofing Progress on the Back of the House

I've been fortunate to have a couple days of really nice weather and I'm making good progress on shingling the north side of the house.


Sunday, September 20, 2009

Ridge Vent Details

When you build a roof, it has to be built so that air can move freely between the underside of the roof surface and the top surface of the roof insulation. One of the methods by which this is done is to use a ridge vent. This diagram gives you an idea of how it works.



You can see the long narrow opening along the peak of the roof. The opening is approximately 1.5" wide, and runs the entire length of the top of the roof except for about 4' on either end.



The ridge vent is made of flexible plastic and comes in a roll 30' long and 14.5" wide. It gets folded over the peak of the roof and nailed down along the edges. It allows air to flow up through the slot in the roof and out the sides of the vent.




The cap shingles are installed on top of the ridge vent. You start installing the shingles on one end of the roof, and install them so that each shingle is overlapped by the next one. The nails are always covered by the next overlapping shingle... except for the last shingle. On that one, I'll put some silicone sealant on top of the nail heads.

Flashing The Dormer Peaks

The point at which the peak of the dormer meets up with the main roof is one that has to be flashed carefully. In addition to using the peel-n-stick flashing, I've built up another layer of protection using aluminum strip-flashing.

I first cut a piece of aluminum L-flashing about 2' long. I cut along the fold line for about 8" and then fold the ends up a bit. I then lay it over the peak of the dormer with the two legs laying flat on the upside of the main roof. I don't put any nails within 6" of the peak of the dormer.



Then I cut a piece of 9" flat aluminum stock about 12" long. I cut a V-shape out of one end, and lay it down over top the first piece of flashing. I then put a generous amount silicone sealant along the seam where the two pieces overlap.



Lastly, I lay another piece of peel-n-stick flashing over the top edge of the aluminum flashing. Once the shingles are in place, I don't think I'll have any problems with water coming in here.

The most important thing to remember about roofing is that for any for any two pieces of roofing material... whether it be tar paper, or peel-n-stick flashing, or shingles... the upper piece must always overlap the lower piece. Always. Always. Always.

Monday, September 14, 2009

Getting Ready To Shingle Again

I've been getting ready to start shingling the back side of the house. This time I'm installing all the work platforms first, across the entire roof, rather than just for the section I'm working on. I'm hoping that will speed up the entire shingling process.


Thursday, September 10, 2009

Drum Roll Please

Today I finished the shingling on the front half of the roof.

Wednesday, September 9, 2009

Flashing The Front Of The Dormers

Any time there's a change in a wall-to-roof plane, it's a possible trouble spot for moisture problems. I've installed aluminum flashing (known as apron flashing) where the main roof meets the front wall of the dormer. The flashing sits on top of the shingles and then continues up the wall underneath the housewrap. This gives the best protection against water getting underneath the shingles.

At the corners of the dormers, I've also fashioned a kick-out flashing which continues past the step flashing. This will prevent water from running down the side of the dormer and turning the corner to possibly get in underneath the apron flashing.

Once everything was in place, I added a bit of silicone sealant to the inside seams and brought the housewrap down in front of the flashing.



Wednesday, September 2, 2009

Roofing Update

Still working my way down the roof. Almost finished this side.