Wednesday, February 10, 2010

Rough-in For The Basement Half-bath

I've finished up the last major piece of rough plumbing. This is for the half-bath that will eventually go in the basement.

That's the toilet drain on the left (orange cap), the toilet vent up the middle, and the sink drain and vent up the right side.

The drain lines connect with the rest of the drain lines in the basement. The vent stack goes up the wall through the main floor and then up to the loft where it joins another vent and then goes out through the roof.

Of course the drain lines will eventually be underneath the basement floor. You can see the metal strip along the base of the wall... that's that level at which the basement slab will be.




2 comments:

  1. Ooh, good luck with all this! I'd love to see an update!
    If you visit my blog, I recently posted photos of our own bathroom renovation. It has been over a year and it's STILL NOT DONE! Close though :)

    Lamb's Most Recent Post: I Bought A Chayote Squash. Now What?

    Lamb's 2nd Most Recent Post: Why Jack Russells Are The Best Dogs

    ReplyDelete
  2. Hi there. Good to hear your bathroom reno is almost done. It's comforting to hear that other people's work takes forever too. ;-)

    ReplyDelete