Wednesday, August 4, 2010

Rough Plumbing Completion

Now that my rough plumbing inspection is done, I was able to connect the roof vents with the rest of the drain/waste/vent system. (Just to back up a bit… the reason for not connecting them earlier was so that the rest of the system could be pressure tested.)

So far in this house project; designing and installing the DWV system was one of the most enjoyable things I’ve done. I’m kind of sad to see it finished.

The photo on the left shows the capped-off vent pipe. I simply cut off the cap and then added an elbow and another piece of pipe that continued up to the roof vent.


The completed main vent line; top to bottom.